Portfolio status is ambiguous
Unbuilt concepts, competition entries, design documentation and constructed buildings are different achievements. Dates and actual responsibilities must be visible.
Clients may ask AI to recommend a design firm for a housing development concept, an office project or industrial working documentation. I measure these selection queries against the firm's actual building types, design stages, team roles and evidenced project experience.

The broad phrase 'full-service design' does not tell a client which work stages and responsibilities the firm really covers.
Unbuilt concepts, competition entries, design documentation and constructed buildings are different achievements. Dates and actual responsibilities must be visible.
Concept design, statutory design documentation, working drawings and construction-stage services have distinct deliverables and contracts.
SRO membership, BIM proficiency and lead-designer claims require applicable records and evidence; a generic badge is insufficient.
Each buyer intent is checked against actual past projects and proposed deliverables.
| Client question | Evidence to check | GEO improvement |
|---|---|---|
| Who designs public-building concepts? | Comparable assignments and the firm's actual contribution | Project pages with role, stage and supporting evidence |
| Who can prepare design and working documentation? | Contract scope, stages, credentials where legally required | Differentiate deliverables and applicable qualifications |
| Which practices use BIM for residential developments? | Real model workflows, delivery stages and usable examples | Explain actual information-modelling outputs |
| We need a lead designer for an industrial facility | Building-type experience and multi-discipline coordination | Show documented coordination roles and relevant case examples |
Article 48 of the Russian Town Planning Code distinguishes design and working documentation; individual-home requirements are not identical to large capital projects. Article 55.8 sets out conditions for SRO-member rights with statutory exceptions. These texts guide verification, but do not establish any particular firm's project history.
GAEO brings real-estate GEO methodology, not a claimed measured outcome for an architecture-firm client.
I pair project-specific commercial demand with documented expertise and accurate wording.
Separate concept design, technical documentation, BIM, lead design and construction-stage roles.
Verify stage, year, authorial contribution, source and publication rights for each project.
Plan specialism pages, project records, service-stage explanations and relevant expert references.
Repeat non-brand questions and track BMR alongside accuracy of AI descriptions.
Three published monthly plans use the same GAEO prices across sectors. Final scope follows the baseline and project requirements.
I lead the strategy; your team implements website and content specifications.
I study your product, create the content and organize publication.
Contractual BMR targets: baseline +5 / +10 / +15 percentage points in months 1 / 2 / 3.
Start with a free mini-audit or a full GEO audit. A monthly plan includes 50 prompts and 5 AI platforms; broader scope is calculated separately.
Yes, if their stage and unbuilt status are explicit. Visualisations must not be labelled as built projects.
No. Specific contract types and statutory exceptions determine applicability. Each claim should be verified against the applicable rules.
No. Describe the actual process, model outputs, project stages and team responsibilities.
We track a fixed set of buyer questions, BMR, accuracy of specialism attribution and reference to real projects.
The published GAEO audit and monthly plans apply. The scope depends on building types, services, jurisdictions and target queries.

Independent GEO/AEO specialist with business experience since 2008. I personally carry out the diagnostic and build an industry-specific plan, separating verified sources from assumptions.
Professional biography ↗Share your site, permissible portfolio examples and target building types. I will define a baseline research scope.
Discuss an initial audit